Go to “Controls”. There you will find the [MB] simulator for testing. If you want to set up a real PLC connection, you can do this via the “Create new PLC” button at the top right.

On this page you can configure the connection to your PLC. Set the IP, rack and slot for this. For the 1200 and 1500 controllers, access must first be enabled (Configure PLC connection).

Variables can be imported from Tia Portal (Variables). Two test data modules are already created. If a real PLC is used, the modules should be adapted or deleted.